Can u imagine how long is it? wish u good luck.
7.00am : wake up
8.00am : depart (stuck on traffic for 30mins)
8.30am : work started
12.00pm : lunch time
1.00pm : continue work
5.30pm : finish of working hours. (stuck on traffic again)
6.00pm onwards : watch drama until doze off, bath, dinner, doze off again, final go to bed.
Today supervisor showed me a piece of site map, and teach me how to calculate the length of cable needed to link from power box to the elevator base on the given site map.
This is how the cable look like and known as “hoistway”.
Doing half way, I have been order by other department to help him in carry the elevator cast. Forgot to take picture of the cast but have to say that it’s heavy enough to injure your hand if not careful. This is an example if your hand clipped between the cast. Haha
After finished, more forward to start a new stuff which is screwed the ribbon to the push button switch ”it’s switch that used by tester when work in the elevator” and link to female connecter start from pin 4 to pin 13 from brown to black.Due to my home internet connection has cancel, so i post either at friend or gf house. for this post i sent at her hostel at the same time she attached her pretty picture here... ^^"
Saturday came back from kl, without having enough rest morning start my outdoor studies at my home town. What I mentioned here is internship at Niche Elevator Sdn Bhd. That morning after took my uniform from office started with labeling the components on elevator controller which help to guide to plug the cables when construct the board. Afternoon came back from lunch, learned a further step which is wiring. Do wiring for ground and neutral cables for power supply.
Next day on Tuesday, my supervisor gave a piece of paper, where the sketched paper guide us to do wiring on the components. One wrong step can lead to failure or damage on the components.
From here I started to know roughly about the use of relays, psr- phase sequence relay, mcb- mature circuit breaker and why have to separate the power supply to the controller and to the psr units.