Today supervisor showed me a piece of site map, and teach me how to calculate the length of cable needed to link from power box to the elevator base on the given site map.
This is how the cable look like and known as “hoistway”.
Doing half way, I have been order by other department to help him in carry the elevator cast. Forgot to take picture of the cast but have to say that it’s heavy enough to injure your hand if not careful. This is an example if your hand clipped between the cast. Haha
After finished, more forward to start a new stuff which is screwed the ribbon to the push button switch ”it’s switch that used by tester when work in the elevator” and link to female connecter start from pin 4 to pin 13 from brown to black.Due to my home internet connection has cancel, so i post either at friend or gf house. for this post i sent at her hostel at the same time she attached her pretty picture here... ^^"
No comments:
Post a Comment